Murphy’s Cement Update

Trains

A few weeks ago I made the decision to remove the passing siding opposite of Murphy’s Cement. This was for the most part prompted by the turnout just plain not working. Since it was such a small section of track I just ripped it out and based on a conversation with my friend Troy decided to replace it with a Lance Mindheim style one turnout industry. I’ve had some time to rough in the track and now I have a siding that beyond the clearance and grade point is 56 inches, which equates to 406 scale feet. In operational sense that’s about eight 50 foot cars.

For industry I’m thinking of a mining supply or explosives company, in other words a freelanced industry that would be at home on the Missabe.

WP_20121218

 

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s